REEFING Co., Ltd.
REEFING Co., Ltd.
72, pr.Oktyabrya, Miass, Chelyabinsk region, RUSSIA, 456318
+7 (3513) 53 61 00

Articles

 
(Only in Russian)

Oil Refining and Petrochemistry Journal

№6-2005

VV. Lenchevsky, G.Z. Suleimanov, A.S. Pinaev, G.V. Shevchenko

Rationale for nozzle splash plate choosing for distributor trays in chemical and petrochemical production reactors. Read the Article >>>

 

№5-2006

VV. Lenchevsky, A.S. Pinaev, G.V. Shevchenko, R.F. Galiev

Comparative analysis of hydrodynamic schemes of distributor trays operation in mordern hydrotreating reactor constructions.  Read the Article >>>

 

№1-2007

A.V. Kostenko, A.V. Kravcov, E.D. Ivanchina, E.N. Ivashkina

Reforming reactor internals optimalization with use of nonstationary kinetic model.  Read the Article >>>

 

№10-2007

A.A. Nikitin, D.V. Nikiforov, A.S. Pinaev, V.V. Lenchevsky, G.V. Shevchenko

OAO Slavneft-Yanos L24/6 diesel hydrotreating unit modernization.  Read the Article >>>

 

№3-2009

A.V. Kravcov, A.S. Bely and co-authors

Reforming and isomerization radial feed flow reactor internals optimization by mathematical model method.  Read the Article >>>

(Only in Russian)

Chemical Engineering.  № 4-2006

A.S. Pinaev

The company information and previous conference data  Read the Article >>>

 

V.V. Lenchevsky, A.S. Pinaev, G.V. Shevchenko

Distributor trays operational hydrodynamic schemes analysis in modern oil product hydrotreating reactor design.  Read the Article >>>

 

A.S. Bely

Industrial experience of LCh-35-11/600 unit operation with radial feed input from reactor centre to periphery.   Read the Article >>>

 

OIL&GAS JOURNAL. RUSSIA. №6-2009

M.R. Goussev

REEFING, equipment supplier for refineries.  Read the Article >>>

 

OIL. GAS. NOVATIONS.  №9-2010

VV. Lenchevsky, G.Z. Suleimanov, G.V. Shevchenko

Reactor distributor trays at refineries. Choice for nozzle splash plates design.   Read the Article >>>

April 2, 2014. Shell Global Solutions representatives made a working visit…

…on the 11th of March the set of reforming reactor internals has been shipped to the principal ahead of schedule…

...

…on the 4th of March, 2014 another vessel and filter consignments have been shipped to the principals…

...

…January 20, 2014. It has been a month since the drinking water treatment equipment has been operating in Khutorka village, the news report on the subject has been shown on the 1st OTV channel…